Rishikesh is set to welcome a new architectural marvel — the Bajrang Setu — a glass suspension bridge over the Ganga River. Expected to open by December 2025, the bridge will replace the historic Laxman Jhula, which was closed in 2019 for safety reasons.
BulletsIn
• Nearly 90% construction done; completion expected by December 2025.
• Bridge to replace Laxman Jhula, closed in 2019 after 90 years of service.
• Length 132 m, width 8 m; cost ₹60 crore.
• 5 m steel deck for two-wheelers, 1.5 m glass walkways on both sides.
• 66 mm thick glass offers clear view of Ganga below.
• Built downstream of old bridge; earthquake-resistant design.
• Ensures safe, durable connectivity with modern engineering standards.
• Expected to boost tourism, create local jobs, and ease traffic.
• To become new landmark blending tradition with modernity.
• Built with minimal environmental impact, preserving Ganga’s sanctity.




What do you think?
It is nice to know your opinion. Leave a comment.